Specify whether pedestrian crossings have markings
Closed
-
Specify road surfaces
Closed
-
Removing construction:railway:etcs from lines with ERTMS already enabled around Kiruna, part 2 of 2
Closed
-
Removing construction:railway:etcs from lines with ERTMS already enabled around Kiruna
Closed
-
Missing workrules tag (railway)
Closed
-
Removing railway:etcs:start_date from lines with ERTMS already enabled around Gällivare
Closed
-
Removing some very densely spaced nodes
Closed
-
Removing railway:etcs:start_date from lines with ERTMS already enabled south of Kiruna
Closed
-
Removing railway:etcs:start_date from lines with ERTMS already enabled around Kiruna
Closed
-
ERTMS level 2 was switched on last week for this part of Malmbanan, https://bransch.trafikverket.se/om-oss/aktuellt-for-dig-i-branschen3/aktuellt-for-dig-i-branschen/2025-05/uppkopplingen-av-nytt-signalsystem-fortsatter-pa-malmbanan/
Closed
-
#hotosm-project-14868 #DisasterResponse #ESADisasterResponse #KenyaFloods #KenyaFloodResponse
Closed
-
ERTMS level 2 was switched on on Svappavaarabanan last week, https://bransch.trafikverket.se/om-oss/aktuellt-for-dig-i-branschen3/aktuellt-for-dig-i-branschen/2025-05/uppkopplingen-av-nytt-signalsystem-fortsatter-pa-malmbanan/
Closed
-
Specify building and roof levels
Closed
-
Specify building types
Closed
-
New, possible temporary road
Closed
-
Road and building details around Ellinge
Closed
-
Landuse changes around Lund/Klostergården
Closed
-
Path and service road fixes in Eslöv
Closed
-
Bus stop removed, note 4722399
Closed
-
Determine roads lane count