1. Current exit

    Closed
    #73248688 0 2 0 0
  2. Went through Mathry and this was a two-way section

    Closed
    #72912219 1 2 0 0
  3. Tolls removed

    Closed
    #72738515 0 1 0 0
  4. Not open

    Closed
    #71763601 1 4 0 0
  5. Reference as A14 until bypass opens

    Closed
    #71763544 1 8 0 0
  6. Carriageway needed to be connected

    Closed
    #71743734 1 7 1 0
  7. It’s going to be part of the A120

    Closed
    #71301690 0 1 0 0
  8. No evidence to say its motorway

    Closed
    #71301517 1 8 0 0
  9. Service no has no direct access to A14 anymore. Needs to use Swavesey Junction

    Closed
    #71178762 3 2 1 0
  10. (no comment)

    Closed
    #71178685 0 2 0 0
  11. Opened on June 10th at 5am

    Closed
    #71081307 23 44 26 0
  12. Fixing sections due to the movement of the junction by ndrw6

    Closed
    #70944754 9 10 0 0
  13. Fixing sections due to the movement of the junction by ndrw6

    Closed
    #70944713 3 5 0 0
  14. Fixing sections due to the movement of the junction by ndrw6

    Closed
    #70944701 3 5 0 0
  15. Fixing sections due to the movement of the junction by ndrw6

    Closed
    #70944673 4 12 0 0
  16. Dual carriageway according to the Bar Hill improvement work (June 2019) leaflet, by 2020

    Closed
    #70808452 9 6 1 0
  17. Removed

    Closed
    #70711080 0 1 0 0
  18. Removed due to works

    Closed
    #70694109 1 5 5 0
  19. Fixing construction alinging

    Closed
    #70607027 10 11 0 0
  20. Track moved due to section of junction opening and service construction are both shown in the A14 flyover video

    Closed
    #70405346 10 2 11 0