-
Adding the new path
Closed
-
Adding names to buildings
Closed
-
Adding a path. Part of it assembled by rocks some ancient roads.
Closed
-
Changing final section of the path connecting Maclehose Trail from Foot Path to Path. Disconnected a section going towards nwn M086 where I cant really find this path. I can only see another one going to another direction.
Closed
-
Adjusted the path which should connect to HK Trail Sec 1 before H011.
Closed
-
Remove the unnecessary name "Fix me!" for the bridge object.
Closed
-
Removed Node Id 454288922 Man Hing Industrial Centre. And adding addr:street for Marina 8
Closed
-
adding the Sham Tuk Wan Detained Craft Anchorage (深篤灣船隻扣留中心)
Closed
-
Correct the typo of the English inland lot number.
Closed
-
Slightly tune the path based on trace for accuracy.
Closed
-
adding the construction site
Closed
-
Edit name, adding English and different 'Chinese' language
Closed
-
Adding the pumping station
Closed
-
Change area type and add the hotel building.
Closed
-
Changing part of the path made of concrete to Steps. And added Pak Tin Fresh Water Header Tank.
Closed
-
Adding MTR entrance node and label
Closed
-
Connecting the path after a hike with trace.
Closed
-
rollback height back to 240m which is "Height Above HKPD" for survey stations.
Closed
-
Modify the peak height based on Trigonometrical Station Summary measured height published by Lands Department of HK.
Closed
-
Modify the peak location based on Trigonometric Stations Summary (Station No 627, height 241m) published by Lands Department of HK.
Closed