-
maxspeed back to 160 mph: revenue service has begun
Closed
-
Fixed Little Patuxent River
Closed
-
Fixed Odenton boundary
Closed
-
Bridge
Closed
-
Amtrak NEC SAP catenary Baltimore to Grove
Closed
-
New Burgos interlocking, de-electrified track 1
Closed
-
Landover Int reduced, signals bagged, switches removed
Closed
-
Odenton MW Base, switches
Closed
-
Carroll signals
Closed
-
Amtrak NEC SAP catenary Landover to CP Avenue
Closed
-
Amtrak NEC SAP catenary Grove to Carroll
Closed
-
Leggett Interlocking (construction)
Closed
-
Merging parts of Millstone Industrial Track
Closed
-
Portal Bridge infra updates
Closed
-
Portal Bridge infra updates
Closed
-
Portal North electrified:tensioning=fixed (SAP)
Closed
-
Bridge layer added to annul crossing railway
Closed
-
Reversion #3 (MA) maxspeed 160 mph to 150 mph (not designated 160 by Amtrak yet)
Closed
-
Reversion #2 (RI) maxspeed 160 mph to 150 mph (not designated 160 by Amtrak yet)
Closed
-
Reversion #1 (NJ) maxspeed 160 mph to 150 mph (not designated 160 by Amtrak yet), added proposed Clark - Ham speeds
Closed