-
Fixing more tracks by removing covered tags
Closed
-
Removing covered tags from Caulfield local and through tracks at Hawksburn
Closed
-
Rebuilding stations at Hawksburn, Toorak, Armadale and Malvern as well as fixing platform orders in Flinders Street => Cheltenham relation. Previously, platforms were out of order with stations. Also merging several track ways together with same values.
Closed
-
Fixing grass areas around the Bayswater station commuter carpark.
Closed
-
Dividing platforms 10, 12 and 13 at Flinders Street. Also fixing order of Brighton Beach stopping location.
Closed
-
Rebuilding tracks and station at Brighton Beach
Closed
-
Adding area tags along the Flemington Racecourse Line and upgrading Newmarket station.
Closed
-
Updating anticipated Metro Tunnel opening date
Closed
-
Adding cutting tags to Metro Tunnel dive site at South Yarra.
Closed
-
Adding note of grade seperation.
Closed
-
Adding razed Beach Street level crossing in Frankston
Closed
-
Upgrading island platforms 1 and 2 at Camberwell
Closed
-
Adding area tags along the Belgrave Line from Ringwood to Boronia.
Closed
-
Adding Belgrave Line super express relations.
Closed
-
Rebuilding St Albans Secondary Collage buildings.
Closed
-
Adding Flinders Street => Upper Ferntree Gully relation to Belgrave Line route master
Closed
-
Adding relations for Belgrave Line shortworkings to Upper Ferntree Gully and modifying platforms at Union station.
Closed
-
Retagging pedestrian bridge at Bayswater station as for it to appear on the map.
Closed
-
Adding details to Belgrave branch from Ringwood to Belgrave, adding platform edges, adjusting platforms and renaming platforms and stopping markers to feature station name and platform number.
Closed
-
Adding more Belgrave express relations, only using the most common express pattern being express from Richmond => Glenferrie => Camberwell => Box Hill and vice versa.
Closed