1. update building geometry

    Closed
    #169297142 64 0
  2. Bridge is now under construction, with piers built and the superstructure due to arrive on site in May 2025.

    Closed
    #166433164 1 0
  3. Add missing buildings in El Cerrito from Bing imagery. Missing buildings spotted via Overture

    Closed
    #164810929 32 0
  4. Add missing building

    Closed
    #164776657 15 0
  5. Add greenhouses from ESRI World imagery

    Closed
    #164766932 31 0
  6. building tweaks Clongriffin

    Closed
    #152865971 26 0
  7. add buildings Clongriffin

    Closed
    #152865873 10 0
  8. amend building geometry

    Closed
    #152845416 11 0
  9. add buildings Peamount

    Closed
    #152842559 103 0
  10. Name buildings at Grand Canal Harbour. Source: Survey

    Closed
    #152576734 81 0
  11. Add building levels

    Closed
    #152381872 24 0
  12. Change brownfield to construction. This is the site of the AC/DC conversion station for the Celtic Interconnector to France.

    Closed
    #152256626 1 0
  13. Remove demolished buildings, add construction areas Cork Street

    Closed
    #151649270 63 0
  14. Add buildings, remove construction around Newmarket Square

    Closed
    #151649151 81 0
  15. Add construction area

    Closed
    #151648757 6 0
  16. Add Ardee Point Student accommodation scheme, remove construction

    Closed
    #151648347 70 0
  17. Construction complete, house added

    Closed
    #151646185 9 0
  18. Add construction start date

    Closed
    #151645687 1 0
  19. Remove closed internet cafe, building details

    Closed
    #150056231 3 0
  20. Add features, Capel St

    Closed
    #150055957 5 0