Public GPS Traces from Weiers Coetser
|
by Weiers Coetser in osmand Hopetoun Grange new layout |
|
|
by Weiers Coetser in osmand tracing river Don footpath |
|
|
Trace of a bicycle ride in new Craibstone area (and further - which might be redundant) But this should help with some of the road infrastructure |
|
|
by Weiers Coetser in osmand New cycle infrastructure on South College Street and then a cycle to Union Square which might not be relevant |
|
|
by Weiers Coetser in osmand Short stretch of cycling infrastructure Oldmeldeum road |
|
|
by Weiers Coetser in osmand 2023-11-11_16-29_Sat College Street attempt railway station |
|
|
by Weiers Coetser in osmand New development on Auchmill |
|
|
I did a few passes of Bankhead Road, and Old Meldrum Road to try to get the new road layout captured. Unfortunately there is quite a long commute added on both ends (by bicycle) I don't know if I can delete the unneccesary data. |
|
|
Bicycle ride trace (recorded in Strava) which tries to capture new road layout in Bankhead area |
|
|
Route I cycled between Aberdeen and Dyce - a section of it is along the new shared cycle path/walk way down mill drive. Another section is a temporary re-routed section of National Cycle Network Route 1 which bypasses the area where there is building |
|
|
Trip Banbridge to Lough Brickland and back |
|
|
One little road on the outskirts of banbridge |