-
update powerline at this substation per updated imagery
Closed
-
small fix to this powerline
Closed
-
adding a powerline from the Alder/LaGrande transmission line to Eatonville
Closed
-
adding another powerline from the Alder/LaGrande transmission line and adjusting a few other things
Closed
-
adding another powerline that branches off the transmission line from Alder and LaGrande dams
Closed
-
well, this powerline just ends...
Closed
-
removing slip lanes that don't appear to exist
Closed
-
adding powerline south of tacoma
Closed
-
a little more WA-18 alignment in Auburn
Closed
-
aligning part of WA-18 thru Auburn to satellite imagery
Closed
-
fixing layers on this overpass over WA-167
Closed
-
continuing to align roads at the I-5/ WA-18 interchange
Closed
-
aligning ramps at the I-5/ WA-18 interchange to satellite imagery
Closed
-
adding missing oneway= yes tag
Closed
-
US12/ WA 8 should be marked as trunk for the majority of the route from the US 101 split to Aberdeen. It is NOT a motorway
Closed
-
fixing things in Ruston: demoting a road from secondary_link to tertiary, and aligning roads to satellite imagery
Closed
-
ref tag should be WA 16, not SR-16. The latter is incorrect per tagging conventions.
Closed
-
changing tagging of powerlines on McNeil Island from power=line to power=minor_line. Pretty sure there aren't any transmission lines on McNeil Island
Closed
-
adding powerline on Key Peninsula
Closed
-
a minor fix on this powerline
Closed