-
removing median on 125th that they got rid of in a recent paving project and adding a turn restriction in its place
Closed
-
deleting this powerline (I thought I did so already)
Closed
-
adding more detail at the Vashon ferry terminal
Closed
-
adding footway to passenger ferry terminal at Colman Dock
Closed
-
more fixes on Lake Hills Connector
Closed
-
aligning Lk. Hills Connector to satellite imagery
Closed
-
adding MORE powerlines
Closed
-
adding transmission line that connects the two transmission lines on Mercer Island
Closed
-
forgot about changing this interchange
Closed
-
adding underground power transmission cable to Delridge Substation
Closed
-
oh, didn't realize there was already a node for Eastgate located in the proper location. Deleting this one.
Closed
-
Combining pointlessly short ways for the Green River
Closed
-
adding powerlines from Eastgate to Renton
Closed
-
Since part of US 2 in Snohomish is a super-two (limited access, two lanes, but no median) it should be tagged as a trunk.
Closed
-
since WA 522 is a super-two (limited access but no median) it should be tagged as a trunk
Closed
-
adding powerlines that start at the south end of a substation in Eastgate
Closed
-
(no comment)
Closed
-
fixing roads on Queen Anne
Closed
-
fixing roads in Discovery Park
Closed
-
fixing roads in Discovery Park
Closed