adding more powerlines and poless
Closed
-
adding more powerlines in Bremerton
Closed
-
adding more powerlines in Bremerton
Closed
-
adding more powerlines south of Keyport
Closed
-
fixing some roads at Keyport and adding a missing bridge
Closed
-
extended powerline from Bangor to another substation NE of Poulsbo; adding powerlines that come out of that substation
Closed
-
adding some powerlines that branch out of a substation at Bangor
Closed
-
setting voltages for this powerline
Closed
-
adding 115kV powerlines out of Kitsap Substation and S. Bremerton Substation and connecting the two up to each other
Closed
-
correcting voltage on a powerline running between Kitsap and Shelton Substations
Closed
-
adding powerlines and substations in Port Townsend
Closed
-
Delete slip lane from WB US-2 to WB SR-522. No longer there, but satellite imagery hasn't been updated to show that.
Closed
-
minor fixes along WA 104
Closed
-
Exit 20A on I-405 is a 1/2 SPUI; mapping it as such
Closed
-
improving upon the recently-mapped recently-opened braided ramps on NB I-405
Closed
-
correcting a pole that was not attached to a powerline, adding a missing pole, and changing a tower to a pole
Closed
-
fixing more incorrect tags
Closed
-
fixing incorrect tag
Closed
-
removing a section of powerline along 8th St E that's no longer there
Closed
-
changing FS Road 65 to unclassified (was track) because of its high usage being the only way (currently) to get to campgrounds on the N Fk Skykomish river
Closed