OpenStreetMap logo OpenStreetMap

dgryski's Notes

Notes submitted or commented on by dgryski

Id Creator Description Created at Last changed
4621234 dgryski

This path to Windsor drive is blocked off as part of the Inlet District construction.

4718138

There is now a bidirectional separated bike lane on the north side of Seventh Ave between 20th and about here. (Need to do another on-the-ground survey to check exact extent of the new bike infra.)

4126603

Water fountain

4584645 dgryski

108 between University and 132 is now a designated bike route with protected bike lanes.

Surrey plan: https://www.surrey.ca/renovating-building-development/engineering-infrastructure/capital-construction-program/protected

Visible also on Street View.

4680569 dgryski

Harrow St missing. (Labelled residential street on Burnaby GIS.)

4614460 dgryski

This section is now closed indefinitely for safety reasons. The bike path detour is Quebec <-> Switchmen <-> Ontario to get back on the Seaside bike route.

https://vancouver.ca/news-calendar/expo-deck-south-of-science-world-to-close-indefinitely-feb-2025.aspx

4585657 dgryski

Westminster Hwy between the two driveways is a has separated bike lanes (with bollards) on both sides.

4585656 dgryski

This section of sidewalk between Boundary and the driveway is a MUP.

4433396 dgryski

I haven't come down from Craig Ave, but no ford or path is visible from CVG. At the very least these sections of path should be marked with smoothness=impassable and highway=* in accordance with osm.wiki/Key:ford#Occasional_fords

4589113 dgryski

This path is a marked cycling route on both Surrey's bike map from 2022 https://www.surrey.ca/sites/default/files/media/documents/surrey-bike-map.pdf and Translink's updated 2024 Surrey bike route map https://www.translink.ca/-/media/translink/documents/rider-guide/cycling/local-area-maps/pack_tl-cyclemaps_surreywhtrck.pdf