-
construction site. these buildings were removed. construction of a boarding house is in progress.
Closed
-
construction site. all former buildings are removed. The Togal Werk Building is currently being torn down https://www.neuplan.com/projekte/LEV10-18
Closed
-
Add whether way is lit
Closed
-
Add path surfaces
Closed
-
Add building and roof levels
Closed
-
Add building types
Closed
-
Add specific barrier type on a point
Closed
-
Add bollard type
Closed
-
Add whether way is lit
Closed
-
Add building types
Closed
-
Add whether way is lit
Closed
-
Add path surfaces
Closed
-
Add segregated status for combined footway with cycleway
Closed
-
Add whether way is lit
Closed
-
Add tactile pavings on crosswalks
Closed
-
Add crossing type
Closed
-
Add whether there is a crossing
Closed
-
Add building types
Closed
-
Add building and roof levels
Closed
-
Add board type
Closed