jtracey's Notes
Notes submitted or commented on by jtracey
Id | Creator | Description | Created at | Last changed | |
---|---|---|---|---|---|
1322102 | osm.org/node/5464877821 duplicates another node (in correct location) one block north |
||||
855624 | Jiateng Xu | Hazard 1 |
|||
464603 | andrewpmk | Construction site from 2014, may be finished by now |
|||
690710 | lgoldman | I believe the segment of the new BART tracks between Walnut Avenue and Stevenson Boulevard has flipped above-ground and below-ground markings. In fact, that section of track is above ground at the station, crosses a new bridge over Walnut Avenue, then descends into a new tunnel under Stevenson Boulevard, continuing under Lake Elizabeth in Fremont Central Park. |
|||
491496 | jtracey | The construction is (mostly) finished, and Capitol Ave now extends all the way to Fremont Blvd. It has a center divide, so it needs two one-way highways, as well as two intersections for the parking lots. No satellite yet, so GPS is probably needed. |
|||
1042126 | This pathway (and bridge) have been permanently removed for the future LRT station. |
||||
891025 | connecting path osm.org/way/186942857 to service road osm.org/way/131828036 would help routing unless there's a fence in the way now? |
||||
1028650 | Road osm.org/way/28062271 possibly now named "William Tutte Way" - press release https://uwaterloo.ca/daily-bulletin/2017-05-12#mathematics-renaming-service-road-for-bill-tutte - could see if it's actually signed in real life and add if so |
||||
824324 | Jarek 🚲 | Has King Street through Uptown Waterloo not reopened yet? News was it was supposed to reopen to traffic on Nov 30 (http://www.therecord.com/news-story/6996212-uptown-waterloo-breathes-sigh-of-relief-as-major-lrt-work-wraps-up/), still showing as under construction on Dec 21 |
|||
575352 | andrewpmk | s road closed due to lrt w no hgv |