ตราสัญลักษณ์ OpenStreetMap OpenStreetMap

road works that will finish in a complete redesign

โพสต์โดย kai-bcn เมื่อ 5 พฤษภาคม 2011 ในภาษา English

Today I was thinking what to do with a Motorway junction that has been torn down completely more than a year ago (if I remember correctly).

In the end I deleted it from OSM. Was that OK?

Here is why I decided so: I know this junction will never be the same. The old bridge doesn't exist anymore, and 2 new bridges to form a big roundabout on top of the motorway are in the EARLY phase of construction. From what I can tell, the whole joint between Ronda De Dalt/C-32 and A-2 will be different, too. So the whole routing of cars coming and joining A-2 will be different.

As soon as the new junction is up, I'll make sure to GPS track it and add it into OSM again ...

so long, Kai

ที่ตั้ง: el Prat de Llobregat, Baix Llobregat, Barcelona, Catalonia, 08820, Spain
Email icon Bluesky Icon Facebook Icon LinkedIn Icon Mastodon Icon Telegram Icon X Icon

การอภิปราย

ความคิดเห็นจาก Zartbitter เมื่อ 5 พฤษภาคม 2011 เมื่อเวลา 08:55 น.

Yes, deleting non-existing ways is ok. But if the motorway junction is still visible on aerial images (e.g. Bing), best is to leave a way with no attributes except a note telling that aerial image is out of date. Otherwise someone else will trace the motorway junction again ...

ความคิดเห็นจาก kai-bcn เมื่อ 5 พฤษภาคม 2011 เมื่อเวลา 09:17 น.

Ah, good to know.
Thank you very much, this is very helpful.

ความคิดเห็นจาก Sundance เมื่อ 5 พฤษภาคม 2011 เมื่อเวลา 17:41 น.

Oh as well use the construction tags as well

highway=construction
construction=(motorway, motorway_link, trunk, primary, ...)

เข้าสู่ระบบเพื่อแสดงความคิดเห็น