Biểu trưng OpenStreetMap OpenStreetMap

road works that will finish in a complete redesign

Do kai-bcn đăng vào 05 tháng 05 năm 2011 bằng English.

Today I was thinking what to do with a Motorway junction that has been torn down completely more than a year ago (if I remember correctly).

In the end I deleted it from OSM. Was that OK?

Here is why I decided so: I know this junction will never be the same. The old bridge doesn't exist anymore, and 2 new bridges to form a big roundabout on top of the motorway are in the EARLY phase of construction. From what I can tell, the whole joint between Ronda De Dalt/C-32 and A-2 will be different, too. So the whole routing of cars coming and joining A-2 will be different.

As soon as the new junction is up, I'll make sure to GPS track it and add it into OSM again ...

so long, Kai

Vị trí: el Prat de Llobregat, Baix Llobregat, Barcelona, Catalonia, 08820, Spain
Biểu tượng thư điện tử Biểu tượng Bluesky Biểu tượng Facebook Biểu tượng LinkedIn Biểu tượng Mastodon Biểu tượng Telegram Biểu tượng X

Thảo luận

Bình luận của Zartbitter vào 5 tháng 5 năm 2011 lúc 08:55

Yes, deleting non-existing ways is ok. But if the motorway junction is still visible on aerial images (e.g. Bing), best is to leave a way with no attributes except a note telling that aerial image is out of date. Otherwise someone else will trace the motorway junction again ...

Bình luận của kai-bcn vào 5 tháng 5 năm 2011 lúc 09:17

Ah, good to know.
Thank you very much, this is very helpful.

Bình luận của Sundance vào 5 tháng 5 năm 2011 lúc 17:41

Oh as well use the construction tags as well

highway=construction
construction=(motorway, motorway_link, trunk, primary, ...)

Đăng nhập để nhận xét