-
Really?? Lady Bay Bridge one way? It was even two way when it was a rail bridge.
Closed
-
These are all clearly pavement not 'footpath'. But is it really necessary to mark these alongside EVERY stretch of road? Are they even considered a separate roadway? Got tired of my garmin telling me to ride on the pavement through this section.
Closed
-
Personal experience. Road surface details.
Closed
-
There is no path here. It is a patch of lawn with no path, no trail, no markings, no dropped kerb or indication of way.
Closed
-
changed permissions to cycling allowed as shown in council cycling map
Closed
-
farm track
Closed
-
Track from Gypsy Nook road to Field Road
Closed
-
Mixed gravel; not really ridable on narrow tyres
Closed
-
earth and gravel track at western stretch
Closed
-
earth and gravel track at western stretch
Closed
-
no different from the path designations either side
Closed
-
realigned to aerial photo
Closed
-
not a designated footpath, a roadside footway.
Closed
-
cycle permissions at gate
Closed
-
surface, gravel. ridden.
Closed
-
Track ends between fields; does not reach bridleway.
Closed
-
adding stile to hedgerow
Closed
-
Removing stile set across main road
Closed
-
Bell Lane is asphalt all the way. No gravel surface, tho plenty of loose gravel over the asphalt in places.
Closed
-
not happy with this. will visit again.
Closed