-
Construction finished for parts of the buildings. Added Buildungs Birchweidweg building 1 , 3, 5 , 13, 15, 17. All where you already clearly see the outline in the sattalite picture.
Closed
-
After Construction now is finished for the south part a motor street is now only for pedestrians.
Closed
-
Survey whether benches have backrests
Closed
-
Determine whether building construction is now completed
Closed
-
Specify building types
Closed
-
Determine roads lane count
Closed
-
Specify road surfaces
Closed
-
Specify whether parking requires a fee
Closed
-
Specify drinking water types
Closed
-
Determine the heights of kerbs at crossings
Closed
-
Specify whether water is drinkable
Closed
-
Specify whether pitches are lit
Closed
-
Specify fire hydrant positions
Closed
-
Specify parking types
Closed
-
Specify path surfaces
Closed
-
Specify parking types
Closed
-
Specify building types
Closed
-
Determine the heights of kerbs at crossings
Closed
-
Survey whether benches have backrests
Closed
-
Specify memorial types
Closed