1. path connectivity in greeley

    Closed
    #167414151 41 14 1 0
  2. sidewalks, connectivity and new roads

    Closed
    #167411797 67 22 8 0
  3. Re-adding some houses rebuilt after marshall fire

    Closed
    #167377696 6 63 2 0
  4. Trail functionally open now

    Closed
    #167377552 0 8 0 0
  5. Details of goldenrod trail, bicycles not allowed, for some baffling reason

    Closed
    #167377497 2 20 5 0
  6. Major tiger cleanups around Rifle.

    Closed
    #167144870 208 101 98 0
  7. Major tiger cleanups around Rifle.

    Closed
    #167144236 665 99 195 0
  8. Major tiger cleanups around Rifle.

    Closed
    #167143270 470 131 223 0
  9. solar, oil and gas, and service road infrastructure near Rifle

    Closed
    #167142299 286 113 120 0
  10. Bike infrastructure details around Greeley

    Closed
    #167115259 426 104 10 0
  11. Path segment open

    Closed
    #167114325 1 2 2 0
  12. Industrial details, driveways, around Rifle

    Closed
    #167111571 83 11 39 0
  13. Industrial details, oil and gas, solar farm, driveways, around Rifle

    Closed
    #167111520 509 54 2 0
  14. Add goldenrod trail in late-stage construction (looks like it can open in the next few months (summer 2025). Not currently appearing on imagery.

    Closed
    #167103673 101 3 0 0
  15. Surfaces, parking tags

    Closed
    #167073886 40 14 0 0
  16. Road and path surfaces, new paths and parking lots at sheep draw

    Closed
    #167073780 197 61 18 0
  17. Addresses, marked some buildings as demolished after marshall fire and not rebuilt, modified some buildings to new footprints.

    Closed
    #166323718 12 37 0 0
  18. Update branding

    Closed
    #166323335 0 1 0 0
  19. Updated apartments after construction

    Closed
    #166323041 2 14 12 0
  20. Access clarification

    Closed
    #166317140 0 1 0 0