pole_climber's Notes
Notes submitted or commented on by pole_climber
Id | Creator | Description | Created at | Last changed | |
---|---|---|---|---|---|
1267982 | pole_climber | TDC PLANNING 17/01668/ful development of site with the erection of both a freestanding restaurant and a freestanding coffee shop, both with associated drive through facility. installation of associated car park expires Sun 20 Dec 2020
|
|||
1611323 | EdLoach | McDonalds due to open December 19th. The other building being constructed nearby is rumoured to be Costa, though their nearby store by Domino's is still open at present. |
|||
1363274 | EdLoach | Mentioned in today's paper, Morrisons have permission for a car wash area, a tyre service area and two small retail pods in their car park. Survey for when complete. This relates: https://idox.tendringdc.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OYOO7ZQB0LD00 |
|||
1451169 | pole_climber | TDC PLANNING 18/00638/ful sub-division of unit 2a (was Brantano) (to create two new units), external alterations and change of use of new unit 2a from class a1 (shops) to class a3 (restaurants and cafes). expires Tue 15 Jun 2021https://idox.tendringdc.gov.uk/online-applications/applicationDetails.do?keyVal=P7MUM3QB0KO00&activeTab=summary |
|||
1731670 | pole_climber | TDC PLANNING 19/00029/ful change of use from bed and breakfast to residential dwelling. expires Fri 04 Mar 2022https://idox.tendringdc.gov.uk/online-applications/applicationDetails.do?keyVal=PL0BQ1QB0M600&activeTab=summary Web presense seems to have ceased in 2015 so might already be shut. |
|||
1428704 | pole_climber | TDC PLANNING 18/00499/ful subdivision of the existing seven bedroom detached house into 2x semi detached dwellings (1x three bedroom and 1x four bedroom). creation of a new detached three bedroom dwelling in the side garden area. expires Tue 18 May 2021https://idox.tendringdc.gov.uk/online-applications/applicationDetails.do?keyVal=P6CFIUQB0KO00&activeTab=summary |
|||
510592 | pole_climber | "TDC PLANNING 13/01470/ful erection of 77 no. dwellings together with garages, access roads, parking, fencing, walling, public open space, landscaping, drainage, highways infrastructure and other ancillary works. expires Fri 20 Apr 2018
|
|||
510590 | pole_climber | "TDC PLANNING 15/00332/ful proposed construction of 4 bedroom two storey house and detached garage. expires Sun 29 Apr 2018
|
|||
1513347 | pole_climber | TDC PLANNING 18/00946/ful change of use from community hall (use class d1) to a holistic fitness, yoga and pilates studio (use class d2) with ancillary cafe area. expires Tue 10 Aug 2021
|
|||
798616 | pole_climber | TDC PLANNING 16/01240/ful change of use from a1 retail (marine related) to sui generis (car sales). expires Thu 31 Oct 2019
|