OpenStreetMap logo OpenStreetMap

shinjiman's Notes

Notes submitted or commented on by shinjiman

Id Creator Description Created at Last changed
4756373 Majew Lime

New permanent speed limit of 40 in the school zone area

4346642 Petrii

Need to add bus stop (11510) here and north east across the street (11501)

4545881 TheSwavu

New streets going in here. Construction visible on Esri.

4225388 shinjiman

Railway Parade had reconstructed and one side becoming with bus stands for Bayswater Station.

4373809 shinjiman

A roundabout to be built here.

https://www.wa.gov.au/system/files/2022-02/SPL-Dayton-Commercial-Centre-Structure-Plan-No-3-SPN-2188M-1.PDF
https://www.planning.wa.gov.au/docs/default-source/daps/20231117-minutes-no-286-city-of-wanneroo-city-of-swan.pdf

4359733 shinjiman

A roundabout had been built on this location.

https://www.swan.wa.gov.au/city-and-council/planning-for-the-future/major-projects/completed-major-projects/hepburn-avenue-marangaroo-drive-roundabout

4693833 shinjiman

A roundabout to be built here.

https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/metropolitan/scarborough-beach-road-and-green-street/
https://imagine.vincent.wa.gov.au/scarborough-intersection
https://www.stirling.wa.gov.au/city-and-council/shaping-our-city/search-all-projects/scarborough-beach-road-and-green-street-roundabout

4769146 Majew Lime

Speed limit on most, if not all, roads on campus are 30 km/h, not 40

4756375 Majew Lime

New speed limit of 50 for the whole road

4178368

The second half of the station is planned to opened following another shutdown of the Airport and Midland lines, this time between 28 March and 8 April 2024. The eastbound track will be realigned to platform four of Bayswater station. Platforms two and three will open when the Morley–Ellenbrook line opens, which is planned for the end of 2024. CE