Casey Painterさんのメモ
Casey Painterさんが投稿またはコメントしたメモ
ID | 作成者 | 説明 | 作成日時 | 最近の変更 | |
---|---|---|---|---|---|
3069441 | _caleb | on the north side of this road, a sidewalk/bicycle sidepath us being constructed, currently the land is being graded the whole way along. On the south side, there is a completed and new looking sidewalk/bicycle sidepath that isn't (afaik) on the map. The construction on the north side is likely to mirror the path on the south side. via StreetComplete 41.0 |