Build Build Build campaign reaches DEAR PAUL 24’s attention
As a Civil Engineering student, Registered PWD (due to lifelong developmental disability), an advocate of accessibility and public safety, and most of all, frequent editor to OpenStreetMap, most infrastructures are hereby published for information dissemination {see Build Build Build portal} where the North Luzon Expressway (NLEX) Segments, Philippine National Railways (PNR) Rehabilitation, Mass Rapid Transit (MRT) construction across NCR, Bulacan, and Cavite, and the North EDSA Unified Grand Central Station are going to be built from 2018. Moreover, actions are taken by DEAR PAUL 24 at the end of this blog entry, and accessibility features will be added in the near future for the sake of MAPS.ME app and OSM users. Here are the updated lists to guide you with the following status:
Upcoming Construction
- LRTA Line 1 South Extension (starting mid-2018)
- Mega Manila Subway System
- NLEX-SLEX Connector (starting mid-2018)
- Washington Place Philippines Phase 5 (Dasmarinas City)
Upcoming Infrastructures for Completion
- LRTA Line 2 East Extension
- Mactan-Cebu International Airport Terminal 2 (Cebu City)
- Southwest Integrated Transport Exchange System (Paranaque City/CAVITEX)
Upcoming PUV Routes within Cavite
NOTE: SWITX replaces any current routes due to upcoming changes to routing effective April 2018
- Bus Route (Nasugbu - SWITX via Tagaytay City and vice-versa)
- Bus Route (Trece Martires City - SWITX via Dasmarinas City and vice-versa)
Ongoing Rehabilitation
- Congressional Road Network (Dasmarinas City)
- Golden City Footbridge (Dasmarinas City)
- Philippine National Railways
Ongoing Construction
- Cavite-Laguna Expressway (Laguna Segment)
- Daang Hari Road Widening and Overpass Construction (Imus City)
- Drainage Installation and Sidewalk Construction from Don Placido Campos Avenue Junction to Via Verde (Dasmarinas City)
- Metro Manila Skyway (Stage 3)
- MRT Line 7 (North EDSA to San Jose Del Monte City)
- North EDSA Unified Grand Central Station (Quezon City)
- NLEX Segment 10 (Harbor Link)
- SLEX Toll Road 4
- Traffic Island within Salitran Road (Dasmarinas City)
Updated Bus Stops within Cavite
- Parts of Bacoor City
- Dasmarinas City
- Parts of Imus City
Updated PUV Routes within Cavite
NOTES: 1. SWITX replaces any current routes due to upcoming changes to routing effective April 2018 2. Jeepney Routes are marked as Route Master
- Bus Route (Dasmarinas City - SWITX and vice-versa)
- Jeepney Route (Intra-DBB D-F-B-A1-G and vice-versa)
- Parts of Jeepney Route (DBB C - SWITX and vice-versa)
- Jeepney Route (DBB C - SM Dasmarinas and vice-versa)
- P2P Bus Route (Bacoor City/Molino - Muntinlupa City/Alabang and vice-versa)
- P2P Bus Route (Dasmarinas City - Muntinlupa City/Alabang and vice-versa)
Updated Speed Limits
- Expressway Route 1 - 100kph (80kph for Buses and Trucks within NLEX)
- Expressway Route 3 - 100kph (80kph for Buses and Trucks)
- Parts of Expressway Route 4 - 100kph
- Parts of Expressway Route 6 - 60kph
- Highway 419 - 60kph
Actions Taken by DEAR PAUL 24
- MMDA Traffic Schemes are activated on Highway 170/Elliptical Road and its side roads
- Split-segment of certain roadways
- Re-calibration of Bus Routes affected on it
- Updating Speed Limits, including the maximums, advisories, and minimums for safety reasons
- Traffic Safety mechanisms are activated (including swerving prevention and turn restrictions)
- Accessibility features are added
- Building features (floor levels) are added
Don’t forget to share this entry to your friends, and remember to Focus, Inspire, Love, and Motivate for 2020 and beyond.
Sources
- Build Build Build - Philippine Infrastructure Transparency Portal
- DearPaulPH on Mapillary
- dmitrivalencia on YouTube
讨论