OpenStreetMap logo OpenStreetMap

Changeset When Comment
117682383 over 3 years ago

"James' Concourse" is the proper name already. Don't add project names or descriptors.

117681463 over 3 years ago

3. Project names shouldn't be used. `name=` has to be the final name, like a branding.

117681463 over 3 years ago

Please check this was also in `alt_name=`.

117681463 over 3 years ago

This is not a correct name. It was in the proper name, not "220 Nam Cheong St" or something. This is a generic descriptor, can only be used for `description=`.

117660019 over 3 years ago

Please check that the existing slip roads will be used. Don't add new ones.

117625682 over 3 years ago

2. Don't remove the `direction=` either.

117621642 over 3 years ago

1. Please don't snap points onto roads.
2. Please don't remove names. Retag them.

117625682 over 3 years ago

`=cave_entrance` should only be used for caves, not tunnels. Please don't Tag For Renderer.

117589724 over 3 years ago

Please continue to add new tags. Don't remove names.

117575751 over 3 years ago

Please also check this duplicates https://osmlab.github.io/osm-deep-history/#/node/4436530919

117576012 over 3 years ago

Even if you can technically fit multiple with semi-colon `;` (not comma `,`), you shouldn't. Add other tags.

117576220 over 3 years ago

Please check this is already included in `old_name:en=`,

117575126 over 3 years ago

Please don't remove `wikidata=` simply because it prevents you from incorrectly modifying.

117574386 over 3 years ago

Please check this is already included in `alt_name=`.

117574639 over 3 years ago

Please check this is already included in `alt_name=`.

117573742 over 3 years ago

Please create other features separate from the road. They are not the same.

117570126 over 3 years ago

Please don't remove names. Re-tag them.

117569823 over 3 years ago

Please don't use brackets in names. Combine them, or tag separately.

117498369 over 3 years ago

4. Cheung Tung Rd connection is not likely physically divided.

117498369 over 3 years ago

3. This is unnecessary because most of the existing interchange will be reused.