1. Brock Street exit reconstruction, and proposed extensions/realignments added.

    Closed
    #91559866 110 0
  2. St-Jacques Street water main work, Phase 1.

    Closed
    #91243959 15 0
  3. Removing torn down buildings.

    Closed
    #91161658 33 0
  4. Adding Halo Car Wash...

    Closed
    #91161643 32 0
  5. Fixed lane realignments

    Closed
    #91152807 20 0
  6. Express-Collector system open between Hurontario and the Credit River

    Closed
    #91138842 4 0
  7. Removing restricted access tag...

    Closed
    #91138185 1 0
  8. Anticipated scheduled new ramp openings. (For next Monday morning)

    Closed
    #91138167 25 0
  9. Anticipated scheduled ramp opening

    Closed
    #90793745 1 0
  10. RIght dealership name and brand...

    Closed
    #90463983 1 0
  11. Correcting traffic signal emplacements...

    Closed
    #90463805 21 0
  12. Additional closures on Dorval Interchange project.

    Closed
    #90453669 7 0
  13. (Incoming) Opening of the new Ste-Anne-de-Bellevue overpass, with final rerouting of Route 138 and presumed full opening of Notre-Dame Street, and closure of eastbound ramps to Angrignon Boulevard for final setup work.

    Closed
    #90453217 45 0
  14. Flyover ramp still closed.

    Closed
    #90346766 3 0
  15. Revised current temporary routing of Notre-Dame Street.

    Closed
    #90346641 19 0
  16. Opening of the new Westbound 401 Gardiners Road entrance. Old one deleted...

    Closed
    #89769769 28 0
  17. Mid-term closures on local streets surrounding the Turcot Interchange project.

    Closed
    #89484884 52 0
  18. Correcting ramp merges from Highway 15 and Pullman St. to eastbound Ville-Marie Expressway.

    Closed
    #89135048 38 0
  19. Adding westbound ramps, and carpool lot construction at 401 and Gardiners Rd.

    Closed
    #89130698 77 0
  20. Minor edit: removing a "Temporary" tag on a permanent section...

    Closed
    #89129675 1 0