Realignment of Highway 20, assuming its final placement in the Turcot Interchange rebuild project. Also correcting routing of Route 138, with its current temporary, and future permanent place once the appropriates routes will be opened.
Closed
-
Highway and street alignment corrections.
Closed
-
Removing closure of the Girouard Avenue entrance, in anticipation of its reopening...
Closed
-
Railway alignment correction.
Closed
-
Realignment of Highway 15, south of Turcot, to confirm its final realignment, as of July 20th. Notre-Dame Street routed to the westbound lanes at the future Ste-Anne-de-Bellevue Blvd. junction.
Closed
-
Temporary realignment of Highway 520 to reflect works at the Dorval Interchange area.
Closed
-
"HIGHWAY 401 EXPANSION PROJECT CREDIT RIVER TO REGIONAL ROAD 25": Adding Trafalgar Road interchange realignments, and Creditview Road overpass. May need corrections, due to being done by eyesight...
Closed
-
Adding entire "HIGHWAY 401 EXPANSION PROJECT CREDIT RIVER TO REGIONAL ROAD 25". May need corrections, due to being done by eyesight...
Closed
-
Girouard St. entrance and De La Vérendrye exit (both southbound) closed until the end of August, and July 20th respectively.
Closed
-
Train tracks, from Matapédia to Gaspé, is owned by the "Société du chemin de fer de la Gaspésie". Name has been added from Matapédia to Caplan, as rehabilitation work has been done. Road name corrections for "Route de Miguasha".
Closed
-
Converting local streets as "Motorway Link", for their final definitive usage.
Closed
-
Correction of a stretch of street with odd access issues.
Closed
-
Long term closures for a ramp of the Angrignon Interchange, and of Notre-Dame Street, in front of Place Turcot. (Dates added)
Closed
-
Long term closures for a ramp of the Angrignon Interchange, and of Notre-Dame Street, in front of Place Turcot.
Closed
-
Route 138 includes Chemin Jacques-Cartier from the village to the airport (RTSS: 00138-13-145-000C)
Closed
-
Correcting alignment of Route 109, due to going into Matagami, via Boulevard de Matagami, up to the traffic circle
Closed
-
Opening of the James Snow Parkway extension, by eyewitness account. Corrections may be needed...
Closed
-
Reconstruction of Notre-Dame Street West under the Turcot Interchange (March 23rd to end of June)
Closed
-
Correcting highway connection
Closed
-
Obsolete reference number removed
Closed