1. Corrected rightful naming of East Shore Road, both in French and English...

    Closed
    #49760198 1 0
  2. Correcting name of "Chemin des Frères-Wright"

    Closed
    #49615271 3 0
  3. Removed the Grand Boulevard "Motorway Junction", since it's not a "Freeway Exit" (it's North American counterpart) per se.

    Closed
    #48863464 1 0
  4. Renamed back all exits On Aut.15 (km 0 to 42), 30 (km 13 to 58), 530, 730 & 930, from official Government sources (Note: Some exits names may be redone due to signs renewals, who could contain more recent changes). Removed some false motorway junctions

    Closed
    #48863347 139 0
  5. Renamed back all exits On Aut.5, and Aut. 20 (km 0 to 38), 30 (km 0 to 9) & 40 (km 9 to 36), from official Government sources (Note: Some exits names may be redone due to signs renewals, who could contain more recent changes)

    Closed
    #48842769 101 0
  6. Corrected the names of Exits 1 to 6 on Highway 40, from official Government sources

    Closed
    #48831799 6 0
  7. 417 Business Park expansion. (Removed obsolete green space)

    Closed
    #45817447 32 0
  8. 417 Business Park expansion.

    Closed
    #45817434 28 0
  9. Rue de Tonnancour closed permanently between Bizet and Beethoven Streets, except for emergency and public utility services.

    Closed
    #44827276 5 0
  10. Corrected position error about Royal Oak station Platform 1

    Closed
    #44745859 5 0
  11. Added the entire proposed extension of Highway 20 from Trois-Pistoles to RImouski, according to the recommended alignment. Slight corrections for Route 132 in the current Highway 20 end's vincinity.

    Closed
    #44287675 284 0
  12. Correction de désignation des segments de routes projetés dans le cadre du prolongement de l'Autoroute 35 (Phases 3 et 4) (But: Faire apparaître les segments projetés mais non encore construits)

    Closed
    #43271733 12 0
  13. Ajout des segments de routes projetés dans le cadre du prolongement de l'Autoroute 35 (Phases 3 et 4) (mention "Proposed" réassignée)

    Closed
    #43087382 17 0
  14. Ajout des segments de routes projetés dans le cadre du prolongement de l'Autoroute 35 (Phases 3 et 4)

    Closed
    #43087232 137 0
  15. Corrected the commercial inspection point and added lane for export control at Highgate Springs. Added Bus inspection point and Commercial inspection and exit gate at Saint-Armand. Closed the Highgate Springs Vermont Welcome Center (Demolished)

    Closed
    #43084929 1 0
  16. Corrected the commercial inspection point and added lane for export control at Highgate Springs. Added Bus inspection point and Commercial inspection and exit gate at Saint-Armand. Closed the Highgate Springs Vermont Welcome Center (Demolished)

    Closed
    #43084903 27 0
  17. Exit 88 fully open.

    Closed
    #43080384 2 0
  18. Corrections and additions for the I 75-I 280 interchange construction: SB I 75 lanes and future Stickney Ave./Lagrange St. Exit aligment added

    Closed
    #42947725 4 0
  19. Corrections and additions for the I 75-I 280 interchange construction: SB I 75 lanes and future Stickney Ave./Lagrange St. Exit aligment added

    Closed
    #42947689 25 0
  20. Ajout et/ou corrections de rues à Miquelon (avec contrevérifications par imagerie aérienne récente)

    Closed
    #41584283 84 0