3484935 | carlb | Permanently closed, per https://www.insideottawavalley.com/news-story/10813274--regret-the-impact-willowdale-retirement-residence-in-smiths-falls-permanently-closes/ Eventual subsequent use or sale of building TBD. |
|||
3484073 | carlb | There is a large (partially-completed) building under construction on this site (Dec 2022), presumably more student housing |
|||
3455326 | Bridge grand opening to be 2022-12-13, per https://www.thewhig.com/news/local-news/kingstons-waaban-crossing-to-open-dec-13 |
||||
3451184 | carlb | Booger King construction is substantially complete, but listing will need to be updated once this is officially open; the burgerking.ca site is just returning the Hwy 401 ONroute locations at the moment, nothing here. |
|||
1131343 | hrabbey | I think this ferry has a toll, but I do not remember for sure. |
|||
2025083 | carlb | This ramp has been replaced by one on the other side of Hwy 38 in the same direction. Should it be removed? There are also likely changes to the commuter carpark now that the eastbound offramp has moved. https://globalnews.ca/news/6290621/hwy-401-construction-kingston-closer-completion/ |
|||
2453735 | carlb | New traffic light in this area, not yet in use, with changed entrance to rail station. |
|||
2461273 | carlb | Does this parking still exist? |
|||
2461262 | carlb | Credit union is in its own freestanding building on an outparcel in the car park. We have the POI but need the outline of that building, which is not on any of the aerial imagery as this was constructed circa-Sept 2020 (so still new). |
|||
2456619 | carlb | A $63 million rebuild of these docks is planned to accommodate a new ferry, the Wolfe Islander IV, currently under construction: https://www.thewhig.com/news/local-news/wolfe-island-ferry-dock-rebuilds-get-provincial-funding |