1. Starting to add some 115kV powerlines originating from the Cowlitz Substation

    Closed
    #20201337 39 8 0 0
  2. continuing to add powerlines from South Tacoma to Cowlitz Substations

    Closed
    #20201177 68 10 0 0
  3. adding some 230kV powerlines from South Tacoma to Cowlitz, and also a cable from the Fredrickson power plant

    Closed
    #20199376 81 13 0 0
  4. fixing Alder Lake

    Closed
    #20187432 0 4 1 0
  5. adding powerline to Lake Alder

    Closed
    #20187013 498 128 28 0
  6. continuing to work on the Cowlitz - Alder/ LaGrande powerline

    Closed
    #20185911 66 47 11 0
  7. naming Woodland Substation

    Closed
    #20185893 0 1 0 0
  8. fixing powerline that goes from Cowlitz Substation to Lake Alder

    Closed
    #20185881 17 36 1 0
  9. adding more powerlines south of Tacoma

    Closed
    #20184901 105 14 55 0
  10. adding powerlines in S. Tacoma and Lakewood

    Closed
    #20179762 132 1 1 0
  11. adding a powerline in NE Tacoma

    Closed
    #20172182 62 2 0 0
  12. fixing voltage on this powerline. 1 circuit is 230 kV, the other is 115 kV.

    Closed
    #20168524 0 1 0 0
  13. adding powerline along WA 507

    Closed
    #20094722 279 37 3 0
  14. adding new powerlines in Yelm and larger substation. Adding names to substations, too

    Closed
    #20094519 11 9 3 0
  15. adding a powerline that goes SW from Electron

    Closed
    #20093284 544 50 38 0
  16. naming powerlines and a substation

    Closed
    #20093017 0 3 0 0
  17. Fixing relation membership issues of way that surrounds part of Fort Lewis

    Closed
    #20079712 9 8 0 0
  18. adding a powerline from another substation at Wild Horse wind farm

    Closed
    #20062068 36 3 0 0
  19. continuing the powerline that goes along the Iron horse trail

    Closed
    #20061851 302 25 1 0
  20. fixing mistakes made by new user

    Closed
    #20061701 0 2 0 0