Public GPS Traces from goldfndr
|
I-90 eastbound new geometry on rightmost lane on concrete-surfaced bridge |
|
|
I-90 eastbound new geometry on center line (middle 3rd of 5 lanes) |
|
|
I-90 eastbound new geometry on center line (middle 3rd of 5 lanes) |
|
|
I-405 northbound exit 9 new geometry, lanes=1, asphalt; additional link to right turn in addition to straight into Park & Ride |
|
|
I-405 northbound exit 9 new geometry, lanes=1, asphalt |
|
|
I-405 northbound exit 9 new geometry, lanes=1, asphalt |
|
|
Biking on Lake to Sound Trail segment C, other than from 8th to near segment B (steep portion) which didn't seem completed/signed. |
|
|
Biking on Lake to Sound Trail segment C, other than from 8th to near segment B (steep portion) which didn't seem completed/signed. |
|
|
I-90 new (temporary) eastbound mainline between I-405 and 148th Ave SE in Bellevue during culvert work. Recorded from middle lane within 5 lane motorway. |
|
|
by goldfndr I-405 revised mainline during construction (right lane) |
|
|
by goldfndr on-ramp from exit 7 |
|
|
by goldfndr exit 7, semi-return to before |
|
|
by goldfndr on-ramp from exit 7 |
|
|
by goldfndr new exit 7, return to before |
|
|
by goldfndr on-ramp from exit 7 |
|
|
by goldfndr new exit 7 |
|
|
by goldfndr new exit 7 |
|
|
by goldfndr Stanwood north on Marine Drive with turn-around pause for speed limit change sign; see changeset 21672584 |
|
|
by goldfndr MRMO walk 2010-02-06 |
|
|
by goldfndr Bellevue |