OpenStreetMap ロゴ OpenStreetMap

wangila123さんのメモ

wangila123さんが投稿またはコメントしたメモ

ID 作成者 説明 作成日時 最近の変更
2869156 wangila123

The Jolly Roger

2976703

Junction signed I-885. Future Route.

3192196 wangila123

The segment of the Winston-Salem Northern Beltway from US-421 to I-40 is under construction

3241760 wangila123

NC 119 is open to traffic

3192198 wangila123

Traffic has moved to the wider portion of the bridge in April.

3238062 Your Village Maps

Local news shows that US 264 from NC 11 Bypass at Greenville to I-95/I-795 is now Interstate 587 (which will eventually connect to a future I-87). And US 264 now follows its old route which was signed as US 264 ALT. I am unclear as to whether the current new signage (I-587 shields) ends at I-795 or I-95.

3192202 wangila123

Hampstead Bypass construction has begun 2 months ago

2983028

Fix shopping center!

2997086 wangila123

Southbound US-52 traffic has been shifted to a new alignment.

2937833

Diverging diamond is now functional. Original ramps (solid lines) are now obsolete. New ramps (broken lines) are now open.