There’s a multi-use trail under construction between Green Bay and the Milwaukee River Parkway on the south side of Good Hope that will be done before the end of the year.

4435275 Gerlcad

There is an ongoing reconstruction project that is adding protected bike lanes to Howard between Howell and Clement. Something to keep an eye out on to add when it finishes. Here is the site: https://city.milwaukee.gov/dpw/infrastructure/supportforbusiness/projectsummaries/Howard-Avenue

4360718 Gerlcad

It’s not signed as such, but there have been significant improvements made to Galena between 35th and Washington Park. It’s gotten to the point that it’s more or less a bike boulevard. The DPW is discussing making it official

4535063 Gerlcad

Protected bike lane is now open a spans the entire Holton Street Bridge. It’s protected by concrete barriers.

4535139 Gerlcad

Slip lane has been removed. On the bridge, the south side bike lane is buffered.

4531925 Gerlcad

The Van Buren two-way PBL is almost done between Kilbourn and Wells. It’s striped and they’ve added concrete. All that’s left is for them to clean it, paint the concrete, and add flexi-posts. It should be done within 2 weeks.

4435248 Gerlcad

This project is beginning on Monday. It’ll extend the PBLs almost to Humboldt. Here is the page: https://engage.milwaukee.gov/north . The design and schedule is on there, so something to look out for.

4317950 Gerlcad

There’s a protected bike lane on the north side of the street between Van Buren and Jackson. The south side will be completed later this year.

4444843 Gerlcad

Phase 2 of the Powerline Trail is now open

4317308 BPTT

This slip lane is closed and will soon be removed. It has bus route relations that will need to be updated, and adjacent landuse features as well.