Notas de Gerlcad
Notas submittite o commentate per Gerlcad
ID | Creator | Description | Create a | Ultime modification | |
---|---|---|---|---|---|
4478557 | There’s a multi-use trail under construction between Green Bay and the Milwaukee River Parkway on the south side of Good Hope that will be done before the end of the year. |
||||
4435275 | Gerlcad | There is an ongoing reconstruction project that is adding protected bike lanes to Howard between Howell and Clement. Something to keep an eye out on to add when it finishes. Here is the site: https://city.milwaukee.gov/dpw/infrastructure/supportforbusiness/projectsummaries/Howard-Avenue |
|||
4360718 | Gerlcad | It’s not signed as such, but there have been significant improvements made to Galena between 35th and Washington Park. It’s gotten to the point that it’s more or less a bike boulevard. The DPW is discussing making it official |
|||
4535063 | Gerlcad | Protected bike lane is now open a spans the entire Holton Street Bridge. It’s protected by concrete barriers. |
|||
4535139 | Gerlcad | Slip lane has been removed. On the bridge, the south side bike lane is buffered. |
|||
4531925 | Gerlcad | The Van Buren two-way PBL is almost done between Kilbourn and Wells. It’s striped and they’ve added concrete. All that’s left is for them to clean it, paint the concrete, and add flexi-posts. It should be done within 2 weeks. |
|||
4435248 | Gerlcad | This project is beginning on Monday. It’ll extend the PBLs almost to Humboldt. Here is the page: https://engage.milwaukee.gov/north . The design and schedule is on there, so something to look out for. |
|||
4317950 | Gerlcad | There’s a protected bike lane on the north side of the street between Van Buren and Jackson. The south side will be completed later this year. |
|||
4444843 | Gerlcad | Phase 2 of the Powerline Trail is now open |
|||
4317308 | BPTT | This slip lane is closed and will soon be removed. It has bus route relations that will need to be updated, and adjacent landuse features as well. |