OpenStreetMap logo OpenStreetMap

Changeset When Comment
74208413 almost 6 years ago

Are you against splitting where divided? I wouldn't disagree, but it'd be quite a big change in GTA

74208413 almost 6 years ago

It's physically separated here though?

69167470 almost 6 years ago

Ah thanks! I'll note. I can't recall what exactly I intended for that way. Perhaps that it's only suitable for foot, and not for example for cycling? What would the proper combination be then - perhaps foot=yes + bicycle=no? access=no + foot=yes tends to render it as private in the main osm.org layer which discourages me from that option.

70807469 almost 6 years ago

still wrong lol...

71711705 about 6 years ago

Hi,

The proposed alignment for Ontario Line has been given a bit more detail. Would you update the routes you drew? See https://blog.metrolinx.com/2019/07/25/metrolinx-and-infrastructure-ontario-release-initial-business-case-for-ontario-line-subway/

72706872 about 6 years ago

Also minor things like two bike share stations. Could not find Mapillary of some express bus stops like Adelaide/Yonge and Church/Lombard, so didn't add them

62295678 about 6 years ago

mini_roundabout tags removed in osm.org/changeset/72221232

62295678 about 6 years ago

osm.org/node/1416834955 is not what a highway=mini_roundabout is in OSM. mini_roundabout is a road junction without a raised central island but nevertheless subject to roundabout-like traffic flow (traffic entering must yield).

A "round area of paving stones" should be mapped as a round closed way with appropriate highway tag and area=yes.

72034237 about 6 years ago

POI updates not exhaustive, I didn't really pay attention to ones I haven't updated here

71185734 about 6 years ago

+1 and thanks for upgrading the main roads in GTA - that's been bothering me for a while. Having Hwy 7 the same as any street downtown was ridiculous

71948599 about 6 years ago

I see that transit route relations remained broken. Sorry... Might try to fix them at some point

70035576 about 6 years ago

Hi Jonathan,

Your edit added level crossings between a subway line and several footpaths. Did you mean to do this? We don't have level crossings of rapid transit lines in Toronto.

71233692 about 6 years ago

This change makes osm.org/node/3600915103 a bit of a joke. It really is signed only "TD".

71612027 about 6 years ago

Please also use slightly more verbose changeset messages.

71612027 about 6 years ago

You've added the proposed extension to the main route relation osm.org/relation/102386

I don't think that's correct

44613530 about 6 years ago

Some of these are wrong, could you please correct them?

71555168 about 6 years ago

Hi, did you mean to leave a gap in Eglinton Avenue near osm.org/#map=19/43.69956/-79.43191 by deleting osm.org/way/446073986/history or was this accidental?

70871933 about 6 years ago

see osm.org/note/1823403

71071739 about 6 years ago

Quick update on Broadview: I've confirmed in survey that the streetcar track layout at intersections is still as shown in Esri imagery. I haven't had time to split the tracks yet, and first I'll be doing an update of buildings and POIs closer to the Queen end. I might be able to do the tracks around early next week, but if you're interested and have time now go for it (no worries if you don't).

71342036 about 6 years ago

the little free library still needs retagging