OpenStreetMap merkið OpenStreetMap

Breytingasett Þegar Athugasemd
168068511 fyrir um 1 mánuði síðan

On the ground, it's just not numbered, so it's more "noref=yes".

If it wasn't shown and labelled on the official Sustrans map as being part of the NCN, it would actually make more sense.

Some of this unnumbered section of NCN is mapped online by EuroVelo as being their route for EV1 and EV2 rather than following the signed NCN 4... but that's probably more to do with EuroVelo not being up to date with how NCN4 seems to have gotten realigned to match a what seems to be a relatively new local route.

168068511 fyrir um 1 mánuði síðan

It appears to be a Sustrans link to shops at the east end of the route.

https://explore.osmaps.com/?lat=51.47851&lon=-2.62066&zoom=15.7422&overlays=os-ncn-layer&style=Standard&type=2d

167829373 fyrir um 2 mánuðum síðan

Yes, should have been 'foot'. Now corrected.

Thanks for pointing out.

165030070 fyrir 3 mánuðum síðan

I'll have a look again in a few days. Would definitely be better if the signed route from Canning Town did bypass those lights.

I did check out the Dock Rd diversion route yesterday. Still a few bits I'm not fully clear about, but there shouldn't be too much to tweak with on OSM when the viaduct works begin takes effect.

147262243 fyrir 4 mánuðum síðan

I have done.

147262243 fyrir 4 mánuðum síðan

I've done some further edits on Hammersmith Rd and removed the "disused:" prefix for the ref.

I'm not completely sure if the temporary pedestrian ramps have been removed, so I've left them in place.

164936269 fyrir 4 mánuðum síðan

Source is the NTA's published CycleConnects map for Kilkenny, available at https://consult.nationaltransport.ie/sites/default/files/CycleConnects%20-%20Kilkenny%20Urban%20Cycle%20Network.pdf

There's no indication that the cycle network being delivered nationally (including the National Cycle Network) will ever be actual signed routes.

164551835 fyrir 4 mánuðum síðan

It might need updated satellite imagery to get this all accurate, but I get the felling you might have realigned it a bit now.

I have extended the temporary oneway on Dock Rd a little further south after passing there today.

Near the Cycle Shuttle bus stop, I suspect
osm.org/way/893713893 might be the intended shared use path for the new cycle route. At the moment it's just all very under-signed with the shared paths (and speed limits too) , but hopefully some more signs will come here.

164551835 fyrir 4 mánuðum síðan

I've an inkling that Dock Rd might open at some point tomorrow.

164551835 fyrir 4 mánuðum síðan

Should the traffic signals now be removed from osm.org/node/1683288283?

164465083 fyrir 4 mánuðum síðan

I spotted it yesterday. Possibly will still get a few more adjustments between here and the roundabout before Monday.

143339525 fyrir 4 mánuðum síðan

I passed there today. Still closed. Could be at least a few more months before it could open.

164058291 fyrir 4 mánuðum síðan

Thanks. Was a partially deleted source=" tag.

Now fully deleted.

162289487 fyrir 6 mánuðum síðan

Regular problem with ID unfortunately.

161292238 fyrir 7 mánuðum síðan

Would be very tricky to get the right order using ID!

I discovered osm.wiki/Relatify yesterday. It could be particularly useful for mapping new bus route relations although I didn't test it too much.

160127229 fyrir 8 mánuðum síðan

Hi, as it appears that cyclists entering the circular junction don't have to give way to cyclists who are already on the junction, the junction=roundabout tag isn't correct.

junction=circular could be used instead.

I have readded the is_sidepath* tags, although I've also changed this tagging from the (former) tertiary to secondary.

157316645 fyrir 10 mánuðum síðan

A lot of geometries will have to be estimates.

I've made a guess based on how it looks that they will use some of the new Dock Rd as part of a temporary access road into the back of the Expressway car park so that they can complete the works/kerbing on the NE side of the current dead end to Dock Rd.

155855417 fyrir 12 mánuðum síðan

I passed around there yesterday. Apart from the mid-section of Beaconsfield, almost all of the roads are constructed, and where relevant include oneway arrow markings and contraflow cycle logos.

They remain mostly unopened but they are well beyond being changeable. Alignments can always be adjusted later on using GPS or aerial imagery.

140566825 fyrir um 1 ári síðan

Well, there are no actual lanes (including cycle lanes) at these 2 crossing points.

154954364 fyrir um 1 ári síðan

It's not impossible that the temporary crossing on Manor Rd near Pond Rd could get relocated before the diversion begins.

Also I wouldn't be surprised if the advertised cycle route diversion changes to use the full length of Leywick St.

I'll be away when the diversion starts so if you're going to be surveying the diversion, OSM might need some adjustments to get things accurate.

I was told the ramp to the Greenway from Manor Rd is to get widened before the closure begins. I suspect its width won't actually change though. They have cleared the vegetation already which might be the 'widening', but it will be interesting to see if they do move the handrails further apart. (The steps nearby will remain open.)