OpenStreetMap logo OpenStreetMap

Changeset When Comment
160007751 4 months ago

thanks for fixing the broken track but OSM is for THINGS YOU CAN SEE THAT EXIST. These proposed tags should not be here

164862646 4 months ago

Thanks! The only bit with only one track installed is from just north of the platform at Kennedy to a little south of the Tara Ave / Lord Roberts bridge: maybe 600 m or so. The ballast isn't even at grade for this section (as of today), so they've got some work to do

133727246 4 months ago

Please revert this changeset. It doesn't represent real infrastructure. GO Electrification has no budget, according to Ontario Builds (see https://www.ontario.ca/page/building-ontario-transit and search for "electrification". Completion is TBD and proposed budget is $0)

160891435 4 months ago

Okay, but consistently tagged + fictional are still not ground verifiable features. The electrification project has no budget yet, so even if it's marked under construction by the Ontario govt, it's not happening soon (Go to https://www.ontario.ca/page/building-ontario-transit, search for "electrification" and see that "OnCORR (Package 3 - Electrification)" has a TBD completion date and no budget. These changes should be backed out because they're not ground verifiable. We're stuck with diesels for now

160007751 4 months ago

Hey, there's some complete fiction going on here:

1) the Uxbridge line is still mostly single track, especially near kennedy station. I live about 200 m from this, I'd know if there was a new line

2) there are no public electrification plans. If they manage to electrify this line in the next 20 years, I'd be amazed.

160057592 4 months ago

Hey, there's some complete fiction going on here:

1) the Uxbridge line is still mostly single track, especially near kennedy station. I live about 200 m from this, I'd know if there was a new line

2) there are no public electrification plans. If they manage to electrify this line in the next 20 years, I'd be amazed.

160891435 4 months ago

Dunno where you got the electrification proposals from, but Metrolinx haven't shared those yet with people in Toronto

146122970 4 months ago

the bike parking at Kennedy isn't open yet, though

145004877 about 1 year ago

Yeah: the Rona / Lowe's / Canadian Tire mapping in the changeset for east Toronto have no basis in reality

147433584 about 1 year ago

Re Way: 1250157987 (down to Brimley Rd S via the Bluffs) - is this a marked path, or a steep dirt desire line? I pass this area frequently, and I've never seen a path there. The routing services are showing it as a bike route down to Bluffer's Park

53331203 over 1 year ago

Thanks for mapping this: although it's long gone and there are (almost?) no signs of it being here, it certainly shaped housing development in Scarborough. Once you see where it was, you can't unsee it!