מסלולי GPS ציבוריים מאת Jarrardi
|
מאת Jarrardi ב־construction, walking, road tracing River Walk Ranch subdivision, phase 3 roads. They've been dug, but not filled, much less paved. |
|
|
מאת Jarrardi ב־walking, foot path, construction Maverik construction and changes to Hartley and Bozic intersection pedestrian flows |
|
|
מאת Jarrardi ב־walking, foot path Walking path/sidewalk along Idahome |
|
|
מאת Jarrardi ב־walking, construction Idahome RV Park roads, buildings, and shared areas |
|
|
מאת Jarrardi ב־walking, construction Ceemtary intersection changes to crosswalk |
|
|
מאת Jarrardi ב־walking, foot path Walking Path along Bozic business subdivision plus changes to Hartley crosswalk |
|
|
מאת Jarrardi ב־constrution, car New road and bridge at the College of Western Idaho Nampa campus |
|
|
מאת Jarrardi ב־walking, foot path Mill at Middleton walking path (and fence line) |
|
|
מאת Jarrardi ב־streetcomplete More fencline. Will address when I get home. via StreetComplete 59.3 |
|
|
מאת Jarrardi ב־streetcomplete I'm not sure if I'm doing this right. I'll correct when I get home. This is the line of the fence, chest high, black metal. I will address this note when I get home. via StreetComplete 59.3 |
|
|
The River Pointe I portion of the walking path north of Lawrence Kennedy Canal |
|
|
מאת Jarrardi ב־construction, subdivision, Middleton Idaho Access path under construction from Hidden Mill subdivision to walking path |
|
|
מאת Jarrardi ב־construction, subdivision, Middleton Idaho Fence just completed along perimeter of Hidden Mill subdivision, including access pathways (under construction) to walking path |
|
|
מאת Jarrardi ב־construction, walking Walked all the roads under construction in River Walk Crossing subdivision Phase II (except Sawtooth Avenue, which is a different trace) |
|
|
מאת Jarrardi ב־construction, walking Walked the portion of Sawtooth Lake Drive still under construction (River Walk Crossing subdivision Phase II) |
|
|
מאת Jarrardi ב־construction, subdivision, Middleton Idaho River Walk Crossing (or River Walk Ranch?) subdivision, phase 2 portion of Sawtooth Road/Drive/Street/Avenue/whatever. The road has been dug, but mostly not even filled, much less paved. |
|
|
מאת Jarrardi ב־construction, subdivision, Middleton Idaho River Point subdivision, phase 1, just after the roads had been paved and sidewalks installed. This is an incomplete walkover, mostly for matching up to aerial imagry later. |
|
|
מאת Jarrardi ב־construction, walking path The newly constructed portion of the walking path along Hidden Mill subdivision. |
|
|
מאת Jarrardi ב־construction, path Middleton River Walk, phase 1 (built) and phase 2 (under construction) |
|
|
Middleton River Walk West of Boise River Bridge |