来自 Jarrardi 的公开 GPS 轨迹
|
由Jarrardi在construction, walking, road tracing于 River Walk Ranch subdivision, phase 3 roads. They've been dug, but not filled, much less paved. |
|
|
由Jarrardi在walking, foot path, construction于 Maverik construction and changes to Hartley and Bozic intersection pedestrian flows |
|
|
Walking path/sidewalk along Idahome |
|
|
由Jarrardi在walking, construction于 Idahome RV Park roads, buildings, and shared areas |
|
|
由Jarrardi在walking, construction于 Ceemtary intersection changes to crosswalk |
|
|
Walking Path along Bozic business subdivision plus changes to Hartley crosswalk |
|
|
New road and bridge at the College of Western Idaho Nampa campus |
|
|
Mill at Middleton walking path (and fence line) |
|
|
More fencline. Will address when I get home. via StreetComplete 59.3 |
|
|
I'm not sure if I'm doing this right. I'll correct when I get home. This is the line of the fence, chest high, black metal. I will address this note when I get home. via StreetComplete 59.3 |
|
|
The River Pointe I portion of the walking path north of Lawrence Kennedy Canal |
|
|
由Jarrardi在construction, subdivision, Middleton Idaho于 Access path under construction from Hidden Mill subdivision to walking path |
|
|
由Jarrardi在construction, subdivision, Middleton Idaho于 Fence just completed along perimeter of Hidden Mill subdivision, including access pathways (under construction) to walking path |
|
|
由Jarrardi在construction, walking于 Walked all the roads under construction in River Walk Crossing subdivision Phase II (except Sawtooth Avenue, which is a different trace) |
|
|
由Jarrardi在construction, walking于 Walked the portion of Sawtooth Lake Drive still under construction (River Walk Crossing subdivision Phase II) |
|
|
由Jarrardi在construction, subdivision, Middleton Idaho于 River Walk Crossing (or River Walk Ranch?) subdivision, phase 2 portion of Sawtooth Road/Drive/Street/Avenue/whatever. The road has been dug, but mostly not even filled, much less paved. |
|
|
由Jarrardi在construction, subdivision, Middleton Idaho于 River Point subdivision, phase 1, just after the roads had been paved and sidewalks installed. This is an incomplete walkover, mostly for matching up to aerial imagry later. |
|
|
由Jarrardi在construction, walking path于 The newly constructed portion of the walking path along Hidden Mill subdivision. |
|
|
Middleton River Walk, phase 1 (built) and phase 2 (under construction) |
|
|
Middleton River Walk West of Boise River Bridge |