Jarrardiさんによる公開GPSトレース
|
に Jarrardi が construction, walking, road tracing に投稿 River Walk Ranch subdivision, phase 3 roads. They've been dug, but not filled, much less paved. |
|
|
に Jarrardi が walking, foot path, construction に投稿 Maverik construction and changes to Hartley and Bozic intersection pedestrian flows |
|
|
に Jarrardi が walking, foot path に投稿 Walking path/sidewalk along Idahome |
|
|
に Jarrardi が walking, construction に投稿 Idahome RV Park roads, buildings, and shared areas |
|
|
に Jarrardi が walking, construction に投稿 Ceemtary intersection changes to crosswalk |
|
|
に Jarrardi が walking, foot path に投稿 Walking Path along Bozic business subdivision plus changes to Hartley crosswalk |
|
|
に Jarrardi が constrution, car に投稿 New road and bridge at the College of Western Idaho Nampa campus |
|
|
に Jarrardi が walking, foot path に投稿 Mill at Middleton walking path (and fence line) |
|
|
に Jarrardi が streetcomplete に投稿 More fencline. Will address when I get home. via StreetComplete 59.3 |
|
|
に Jarrardi が streetcomplete に投稿 I'm not sure if I'm doing this right. I'll correct when I get home. This is the line of the fence, chest high, black metal. I will address this note when I get home. via StreetComplete 59.3 |
|
|
The River Pointe I portion of the walking path north of Lawrence Kennedy Canal |
|
|
に Jarrardi が construction, subdivision, Middleton Idaho に投稿 Access path under construction from Hidden Mill subdivision to walking path |
|
|
に Jarrardi が construction, subdivision, Middleton Idaho に投稿 Fence just completed along perimeter of Hidden Mill subdivision, including access pathways (under construction) to walking path |
|
|
に Jarrardi が construction, walking に投稿 Walked all the roads under construction in River Walk Crossing subdivision Phase II (except Sawtooth Avenue, which is a different trace) |
|
|
に Jarrardi が construction, walking に投稿 Walked the portion of Sawtooth Lake Drive still under construction (River Walk Crossing subdivision Phase II) |
|
|
に Jarrardi が construction, subdivision, Middleton Idaho に投稿 River Walk Crossing (or River Walk Ranch?) subdivision, phase 2 portion of Sawtooth Road/Drive/Street/Avenue/whatever. The road has been dug, but mostly not even filled, much less paved. |
|
|
に Jarrardi が construction, subdivision, Middleton Idaho に投稿 River Point subdivision, phase 1, just after the roads had been paved and sidewalks installed. This is an incomplete walkover, mostly for matching up to aerial imagry later. |
|
|
に Jarrardi が construction, walking path に投稿 The newly constructed portion of the walking path along Hidden Mill subdivision. |
|
|
に Jarrardi が construction, path に投稿 Middleton River Walk, phase 1 (built) and phase 2 (under construction) |
|
|
Middleton River Walk West of Boise River Bridge |