OpenStreetMap 로고 OpenStreetMap

road works that will finish in a complete redesign

kai-bcn님이 English로 2011년 5월 5일에 게시함.

Today I was thinking what to do with a Motorway junction that has been torn down completely more than a year ago (if I remember correctly).

In the end I deleted it from OSM. Was that OK?

Here is why I decided so: I know this junction will never be the same. The old bridge doesn't exist anymore, and 2 new bridges to form a big roundabout on top of the motorway are in the EARLY phase of construction. From what I can tell, the whole joint between Ronda De Dalt/C-32 and A-2 will be different, too. So the whole routing of cars coming and joining A-2 will be different.

As soon as the new junction is up, I'll make sure to GPS track it and add it into OSM again ...

so long, Kai

위치: el Prat de Llobregat, Baix Llobregat, Barcelona, Catalonia, 08820, Spain
이메일 아이콘 Bluesky 아이콘 Facebook 아이콘 LinkedIn 아이콘 마스토돈 아이콘 텔레그램 아이콘 X 아이콘

토론

2011년 5월 5일 08:55Zartbitter님의 의견

Yes, deleting non-existing ways is ok. But if the motorway junction is still visible on aerial images (e.g. Bing), best is to leave a way with no attributes except a note telling that aerial image is out of date. Otherwise someone else will trace the motorway junction again ...

2011년 5월 5일 09:17kai-bcn님의 의견

Ah, good to know.
Thank you very much, this is very helpful.

2011년 5월 5일 17:41Sundance님의 의견

Oh as well use the construction tags as well

highway=construction
construction=(motorway, motorway_link, trunk, primary, ...)

댓글을 남기려면 로그인하세요