اوپن سٹریٹ میپ لوگو OpenStreetMap

road works that will finish in a complete redesign

5 May 2011 کوں English وچ kai-bcn دی طرفوں پوسٹ کیتا ڳیا.

Today I was thinking what to do with a Motorway junction that has been torn down completely more than a year ago (if I remember correctly).

In the end I deleted it from OSM. Was that OK?

Here is why I decided so: I know this junction will never be the same. The old bridge doesn't exist anymore, and 2 new bridges to form a big roundabout on top of the motorway are in the EARLY phase of construction. From what I can tell, the whole joint between Ronda De Dalt/C-32 and A-2 will be different, too. So the whole routing of cars coming and joining A-2 will be different.

As soon as the new junction is up, I'll make sure to GPS track it and add it into OSM again ...

so long, Kai

محل وقوع: el Prat de Llobregat, Baix Llobregat, Barcelona, Catalonia, 08820, Spain
ای میل آئیکان بلو سکائی دا آئیکن فیس بُک دا آئیکن لنکڈ اِن دا آئیکن میسٹوڈون دا آئیکن ٹیلی گرام دا آئیکن ایکس دا آئیکن

بحث مباحثہ

5 May 2011تے 08:55دے بارے Zartbitter دی رائے

Yes, deleting non-existing ways is ok. But if the motorway junction is still visible on aerial images (e.g. Bing), best is to leave a way with no attributes except a note telling that aerial image is out of date. Otherwise someone else will trace the motorway junction again ...

5 May 2011تے 09:17دے بارے kai-bcn دی رائے

Ah, good to know.
Thank you very much, this is very helpful.

5 May 2011تے 17:41دے بارے Sundance دی رائے

Oh as well use the construction tags as well

highway=construction
construction=(motorway, motorway_link, trunk, primary, ...)

کمنٹ کرݨ کیتے لاگ ان تھیوو